Malaysia running cost comparison

Battery vs diesel tower lights

Illustrative comparison 80.5%

lower energy cost

Save RM670.76 / month

Battery RM5.43 per night

RM162.87 / month

Diesel RM27.79 per night

RM833.63 / month

9 hours/night · 30 nights/month · diesel at 50% load

Generic battery example, energy costs only. Actual model performance must be confirmed.

Calculate for your site

Start with your own specifications. The 10 kWh battery, 1,000 W lighting, 90% usable capacity, 90% charging efficiency and two-hour charging time below are generic examples. They are not verified KMC500 or HRZ322 specifications. Every equipment and cost input is editable.

View comparison results ↓

1. Battery & lighting

Generic example only. Enter the selected model’s datasheet values.

2. Site schedule & energy prices

Compare the same operating hours and equivalent lighting coverage.

3. Diesel consumption

Kyusen-supplied operating ranges. Engine load is not LED brightness.

4. Optional purchase payback

Use comparable quotations. Energy savings alone are not total ownership savings.

View results ↓
Your comparison

Can it cover your night?

One charge covers 9 hours. Estimated reserve: 0 hours. Confirm real-world performance.

Edit assumptions ↑
Battery / monthRM162.87Charging energy only
Diesel / monthRM833.63Fuel only, midpoint consumption

RM670.76 monthly energy savings · 80.5%

Same lighting hours; one battery unit and one diesel unit. When runtime is too short, battery costs are an energy projection requiring an additional charging or battery plan.

Estimated runtime per charge
9.0 hours
Minimum nominal capacity for this night
10.00 kWh
0–100% nominal recharge cost
RM6.03
Recharge of usable discharge window
RM5.43
Average grid power for target charge time
5.56 kW
Grid energy to replenish one night
10.00 kWh
Battery energy cost per night
RM5.43
Diesel fuel cost per night (midpoint)
RM27.79
Diesel fuel cost per night (range)
RM25.65–RM29.93
Diesel fuel cost per month (range)
RM769.50–RM897.75
Monthly difference after extra recurring costs
RM670.76
Cost-neutral electricity rate (energy only)
RM2.78/kWh

Purchase break-even

Enter the extra upfront cost to estimate simple payback.

Uses midpoint diesel consumption and entered recurring costs. Does not include financing, residual value, inflation or unentered replacement costs.

A worked example: nine hours of lighting per night

Assume a 10 kWh nominal battery with 90% usable capacity powering a total battery-side lighting draw of 1,000 W, with no additional loads. Usable energy is 9 kWh, so estimated runtime is nine hours. This leaves no runtime reserve; a real project should allow for battery age, heat, reserve settings and actual power draw.

Illustrative energy costs, not a model performance claim or quotation
For the same nine-hour nightBattery exampleDiesel example
Input priceRM0.5429/kWh including October 2026 AFARM4.75/L industrial assumption
Consumption9 kWh from battery; 10 kWh from grid at 90% charging efficiency0.65 L/hr, midpoint at 50% load
Energy cost per nightRM5.43RM27.79
Energy cost for 30 nightsRM162.87RM833.63

The difference is RM670.76 per 30-night month, or about 80.5% of the diesel fuel cost, under these assumptions. This is an energy-only example; no rental, purchase, service or battery replacement costs have been included.

Does a two-hour charge mean two hours of lighting?

No. Charging time and lighting runtime answer different questions. In this example, a nominal 0–100% recharge requires about 11.11 kWh from the grid and costs RM6.03. Delivering that energy in two hours requires about 5.56 kW of average grid power. The charger, battery management system and supply must support it; average power does not describe peak power, current taper or a verified charging time.

After the nine-hour night, replenishing the 9 kWh actually used requires 10 kWh from the grid and costs RM5.43. A full nominal recharge and a normal nightly top-up need not cost the same. Confirm the manufacturer’s charging time and its starting and ending state of charge.

Which Malaysian electricity and diesel rates should you use?

Peninsular Malaysia business electricity

The Energy Commission tariff schedule, effective 1 July 2025 to 31 December 2027, lists low-voltage non-domestic general charges of 27.03 sen/kWh for energy, 8.83 sen/kWh for capacity and 14.82 sen/kWh for the network. Together these are 50.68 sen/kWh, or RM0.5068/kWh. The RM20 monthly retail charge is separate.

Single Buyer reports October 2026 AFA of +3.61 sen/kWh. The calculator and worked example start at RM0.5429/kWh: the RM0.5068 base plus RM0.0361 AFA. This is a dated October snapshot, not a live rate, and excludes taxes, levies, rebates and other account-specific charges.

AFA changes monthly. Replace the calculator rate with the marginal cost of charging on your bill. Allocate fixed charges separately only where the project adds them; an existing account’s entire monthly fixed charge should not automatically be assigned to one light.

For an eligible low-voltage non-domestic Time of Use account, the scheduled components total RM0.5217/kWh at peak and RM0.4808/kWh off-peak, before adjustments. Use the rate for the time you charge, even if the light operates later. Mixed charging periods need a weighted rate. Domestic, medium/high-voltage, Sabah and Sarawak accounts need their own applicable rates; new maximum-demand costs may also matter.

Industrial diesel: use your delivered invoice

Kyusen’s supplied planning range is RM4.50–5.00/L; the calculator uses its midpoint of RM4.75/L. This is an industrial purchasing assumption, not a verified current market quotation. MOF’s weekly retail dataset distinguishes Peninsular and East Malaysia prices. Pump prices, subsidy eligibility and delivered industrial supply terms can differ. Enter your actual eligible delivered price, including relevant delivery costs.

For context, that official dataset lists Peninsular retail diesel at RM5.27/L for 8–14 October 2026. This is a dated retail reference above the supplied industrial range; it does not validate RM4.50–5.00/L as today’s delivered price. The calculator retains Kyusen’s requested industrial assumption until you enter a current quotation.

The following consumption ranges were supplied by Kyusen. They are planning inputs for the referenced diesel equipment, not a universal rating for all tower lights.

Kyusen-supplied diesel assumptions at nine hours per night
Engine loadConsumptionNightly fuel cost at RM4.50–5.00/L
50% load0.60–0.70 L/hrRM24.30–RM31.50
75% load0.80–0.95 L/hrRM32.40–RM42.75
Full load1.10–1.25 L/hrRM44.55–RM56.25

Generator engine load is not the same as lamp brightness. Other connected loads, idle operation and equipment condition affect fuel use. Use measured L/hr for your intended lighting setup where available.

Charging efficiency: keep it editable

Manufacturer data illustrates why efficiency must be model-specific: Victron’s IP67 charger specifications list maximum efficiencies of 93–96%, depending on the charger. Those are charger-only maxima, not wall-to-battery performance for Kyusen equipment. The calculator’s 90% wall-to-battery value is an illustrative planning assumption. Replace it with measured grid energy versus energy replenished, or verified whole-system data.

Multi-stage charging includes changing current as the battery approaches full charge. Temperature, supply limits, chemistry, battery size and starting state of charge can change recharge time. A two-hour target must be confirmed against the selected model’s charger and supply requirements.

How the calculator works

Usable battery energy
Nominal kWh × usable capacity % ÷ 100
Runtime in hours
Usable kWh ÷ [(lighting W + additional W) ÷ 1,000]
Charging energy per night
Total draw in kW × lighting hours ÷ charging efficiency
Battery energy cost per night
Charging kWh × electricity price in RM/kWh
Diesel cost per night / month
L/hr × operating hours × RM/L; multiply by operating nights for a month
Simple purchase payback in months
Extra upfront battery cost ÷ (monthly diesel fuel cost − monthly battery energy cost − extra monthly battery costs)

Use charging efficiency as a decimal in the formula: 90% = 0.90. Consumption and runtime are assumed constant, and the battery starts each night charged. The payback result uses midpoint diesel consumption. A zero or negative monthly saving gives no payback, and a runtime shortfall withholds the payback result until an achievable setup and its additional costs are entered.

The cost-neutral electricity rate shows where battery charging energy costs equal diesel fuel costs per night. It excludes upfront and other operating costs. Purchase payback excludes financing and residual value; a rental comparison should instead use the difference between rental quotations in the monthly recurring-cost field.

Choose for your site, not just the lowest energy cost

Battery can suit your project when…

  • You can recharge reliably between shifts.
  • The usable capacity covers the night with a sensible reserve.
  • Reducing engine noise and exhaust at the lighting location matters.
  • The selected light meets the required lux, area and mast height.

Diesel can suit your project when…

  • Grid charging is unavailable or turnaround time is too short.
  • You need long continuous shifts and a practical refuelling plan.
  • The unit must also supply other approved electrical loads.
  • A comparable diesel quotation gives a better overall project cost.

Equal watts do not guarantee equal light output or coverage. Compare lux at the working area, beam distribution, glare control, lumen output, mast height, wind rating and safe installation. If multiple battery units are needed to replace one diesel tower, include all their power and costs. This calculator compares one unit of each type.

Battery lighting avoids an engine’s exhaust at the point of use while operating on battery power. Grid generation, transport and battery manufacture still have impacts. No carbon reduction, noise level or lifetime claim is calculated here. Charging from a diesel generator needs its actual delivered electricity cost, including losses and generator fuel use.

Confirm the right tower light with Kyusen

Send your site location, lighting area or lux requirement, hours per night, number of nights and available charging supply. Kyusen can confirm suitable models, availability and a rental or purchase quotation.

For a KMC500 or HRZ322 comparison, ask for the current datasheet: nominal and usable battery kWh, power draw at each brightness setting, charger input, charging time and state-of-charge conditions, tested runtime, battery chemistry and cycle-life conditions.

Sources and assumption notes

Checked on 8 October 2026. Tariffs and fuel prices can change; verify the current bill and supplier invoice before making a project decision. Equipment examples are editable and no verified KMC500 or HRZ322 specifications have been assigned.

Diesel consumption and industrial fuel-price range: supplied by Kyusen for this guide. No public manufacturer datasheet was supplied for those consumption figures. Calculated results are estimates and do not guarantee equipment performance or savings.